Challenges:
Massive Cargo Volume: A total of 276 pieces, weighing 1,967 tons, with a volume of 16,830 cubic meters.
Scaffolding within the Hold: Ensuring safety required proof of scaffold load capacity and a detailed safety plan.
Direct Transfer of Boilers to the Barge: Multiple lifting operations would increase risks and costs.
Realogistics Highlights:
Conducted on-site cargo inspections, ensured real-time updates, and arranged customs clearance in batches without delaying the shipping schedule.
Addressed a surge in cargo volume by constructing scaffolding in the ship's hold, ensuring simultaneous shipment of all items while keeping costs manageable.
Held multiple meetings to refine the scaffolding operation plan, successfully gaining approval from the port authority and shipowner.
Secured "direct ship-to-barge transfer" permission, effectively reducing both shipping risks and costs.
Contact Realogistics today for a quick quote!
WhatsApp: +85269373282
Email: tony.wu_hkg@realogistics.net
Skype: tony.wu_hkg@hotmail.com
Realogistics International Group Co., Ltd. Established in 2012 in Hong Kong.
Comments